44 MW
wind farm capacity
44 MW
wind farm capacity
3 MW
power of individual Vestas V136 wind turbines
Skurpie Wind Farm is located in Płośnica Municipality, Działdowo Poviat, Warmian–Masurian Voivodeship. Skurpie WF was put into operation in 2015. Skurpie WF includes 19 Siemens SWT- 2.3 – 108 wind turbines with tower height of 115 m and rotor diameter of 108 m, a main electrical substation and underground transmission line infrastructure. Total capacity of Skurpie WF is 43.7 MW.
Skurpie WF is operated by Polenergia Farma Wiatrowa 4 Sp. z o.o., a special purpose vehicle wholly-owned by Polenergia.
We invite you to explore Polenergia Group’s best practices in these areas: